Bathroom Remodeling

Bathroom remodels that take about 3–5 weeks, built by our own licensed crews.

East Bay: (510) 350-3539 SF: (415) 366-3963

How long a bathroom remodel takes

A bathroom remodel with us takes about 3–5 weeks from the start of construction, depending on scope — a straightforward refresh lands at the shorter end, and a full rework with layout, plumbing, or electrical changes takes longer.

One licensed team for the whole bathroom

Bathrooms combine plumbing and electrical in a small space. We hold CA General B, C36 Plumbing, and C10 Electrical licenses under CSLB #1058605, with in-house engineers, architects, and designers, so the whole project is planned and built by one team — dedicated crews of 2–5 people, using a process refined over 15 years.

Every bathroom is covered by our 1-year workmanship warranty for labor and contractor-supplied rough materials, per signed contract.

Our Work

Recent Projects

How It Works

Three ways to work with us

1

Tier 1

You handle permitting, planning, testing, and materials — we handle the build.

2

Tier 2

You handle material purchasing only — we handle everything else.

3

Tier 3

Heroes handles everything A–Z, from planning and permits through the finished build.